CUNECTRAPCB はんだ付け端子
← トップページへ戻る

技術資料・コラム

銅アルミ複合・PCB/SMTの技術ガイド。

銅アルミ複合バスバー、異種金属接続、PCB/SMT部品の選定・加工・実装・検証を製品別に検索できます。技術記事の本文は英語版です。

検索結果 · 85 件の技術記事

2 ページ / 4

以下の技術記事は英語版です。各リンクから英語の本文をお読みいただけます。

25
Cu-Al / Interface acceptance · 4 min

Comparing peel and shear reports for Cu-Al busbar interfaces

Check specimen geometry, loading, units and failure location before comparing Cu-Al interface reports. Separate peel force per width from shear stress for ESS PCS busbar acceptance.

→
26
Cu-Al / Coating continuity · 4 min read

Planning holiday detection for protective coatings on Cu-Al busbars

Scope coating-discontinuity detection on metal substrates, checking the coating, thickness, cure and inspection regions separately from assembly dielectric and adhesion acceptance.

→
27
Cu-Al / Inspection documents · 4 min read

Matching EN 10204 inspection documents to Cu-Al busbar deliveries

Review 3.1 and 3.2 document validation, test coverage and batch links for Cu-Al busbars, separating raw-material evidence from finished composite-part acceptance.

→
28
Cu-Al / Connector report scope · 4 min read

Checking IEC 61238 connector-report scope for Cu-Al busbar purchases

Match the specific IEC 61238 part, voltage, conductor and specimen before applying connector evidence to Cu-Al hardware; do not extend a cable-connector report to an entire PCS cabinet.

→
29
Cu-Al / Cutting processes · 4 min read

Reviewing Cu-Al busbar cutting edges and post-processing

Compare cutting routes on the actual Cu-Al construction, checking thermal effects, edge geometry, dimensions and cleaning after laser, waterjet or mechanical cutting.

→
30
Cu-Al / Lot acceptance · 4 min read

Agreeing Cu-Al busbar sampling and lot disposition before delivery

Separate Cu-Al lot acceptance from design validation, defining lots, random selection, defect classes, acceptance rules and rejection disposition without promising zero defects.

→
31
Cu-Al / Degreasing checks · 4 min read

What a water-break check establishes after Cu-Al busbar degreasing

Scope water-break screening for hydrophobic contamination separately from ionic residues and electrical acceptance, with surface, trapped-water and drying limitations.

→
32
Cu-Al / Contact-face definition · 4 min read

Defining copper-face orientation on Cu-Al busbar assembly drawings

Define Cu-Al busbar layers, A/B faces, mating materials and contact windows to prevent mirrored assembly errors and clarify edge and insulation requirements.

→
33
Cu-Al / Quote comparison · 4 min read

Comparing Cu-Al busbar quotations per kilogram, metre and finished piece

Normalize Cu-Al busbar quotations to an agreed finished part, separating mass, machining loss, insulation, assembly and one-time tooling for ESS PCS purchasing.

→
34
Cu-Al / Production handover · 4 min read

Controlling Cu-Al busbar revisions from approved sample to production

Connect Cu-Al drawings, layers, sample identities, inspection and assembly evidence to a controlled revision, with change effectivity and deviation disposition.

→
35
Cu-Al / Organic coatings · 4 min read

Agreeing cross-cut acceptance for organic coatings on Cu-Al busbars

Separate coating cross-cut ratings, tape testing and quantitative adhesion from insulation acceptance, retaining thickness, substrate, locations and failure layers.

→
36
Cu-Al / Plastic insulators · 4 min read

Using water-absorption reports to select plastic Cu-Al busbar insulators

Check resin identity, specimen thickness, conditioning and exposure before comparing plastic insulators, separating material screening from wet electrical and dimensional validation.

→
37
Cu-Al / Prevailing-torque nuts · 4 min read

Separating locknut running resistance from clamp force in Cu-Al busbar joints

Review prevailing torque, seating, clamp force and reuse of steel locknuts for Cu-Al joints with matched fasteners, temperature conditions and assembly records.

→
38
Copper-aluminum / Dimensional decisions · 5 min read

Agreeing uncertainty and decision rules for borderline Cu-Al busbar dimensions

Define Cu-Al busbar dimensional measurands, uncertainty and conformity rules before inspection, distinguishing display resolution from result uncertainty and retaining borderline retests.

→
39
Copper-aluminum / Interface composition · 5 min read

Interpreting SEM-EDS interface line scans on copper-aluminum busbars

Connect Cu-Al busbar EDS scans to specimen locations, spectra and acquisition conditions, separating composition gradients from spatial resolution, layer thickness and phase identification.

→
40
Copper-aluminum / Corrosion validation · 5 min read

Planning mixed-flowing-gas corrosion validation for Cu-Al busbar joints

Define indoor environmental objectives, assembled joint states and electrical records for Cu-Al mixed-flowing-gas validation, without substituting bare coupons or inventing service-life conversions.

→
41
Cu-Al / Fastener acceptance · 5 min read

Reviewing steel-fastener proof-load reports for Cu-Al busbar joints

Match Cu-Al joint fastener reports to steel grade, geometry, threads and batch, distinguishing proof load from tensile results, clamp force and assembly torque.

→
42
Cu-Al / Mechanical shock · 5 min read

Specifying mechanical shock pulses and continuity monitoring for Cu-Al busbars

Define Cu-Al busbar shock pulse, duration, mounting, input/response points and continuity monitoring, separately from packaging, vibration and short-circuit qualification.

→
43
Cu-Al / Metallographic preparation · 5 min read

Preparing and interpreting metallographic sections of Cu-Al busbars

Specify Cu-Al busbar section locations, preparation and etching states, retain calibrated images and distinguish preparation artifacts from material discontinuities and bond-strength acceptance.

→
44
Cu-Al / Contact-surface inspection · 5 min read

Specifying and rechecking Cu-Al busbar contact-surface roughness

Specify roughness parameters, standard edition, filtering, measurement locations and surface condition for Cu-Al busbars, independently of joint resistance and temperature-rise validation.

→
45
Cu-Al / Insulation thermal ageing · 5 min read

Reviewing TI and RTI for Cu-Al busbar insulation thermal endurance

Match insulation thermal-ageing reports to property endpoint, material, thickness, color and edition, keeping TI and RTI separate from finished-busbar temperature and life claims.

→
46
Cu-Al / Surface inspection · 5 min read

Defining surface and interface coverage in Cu-Al busbar penetrant inspection

Define accessible surfaces, cleaning, compatibility, indication records and separate acceptance criteria for Cu-Al busbar penetrant inspection without claiming internal-interface coverage.

→
47
Cu-Al / Insulation materials · 4 min

Reviewing GWFI and GWIT reports for Cu-Al busbar insulation

Separate insulation-material GWFI and GWIT from end-product glow-wire testing, checking material identity, specimen thickness and report scope against equipment requirements.

→
48
Cu-Al / Shipping packaging · 4 min

Validating long Cu-Al busbar shipping supports and abrasion protection

Match packaging validation to parcel, LTL or pallet shipping and document busbar supports, isolation and pack-out, with separate package and product acceptance.

→

RFQ

仕様・図面をご共有ください。即座に実現性を評価します。

スムーズなご提案のため、以下の項目をお知らせください。未確定の項目があってもご相談いただけます。