A Cu-Al busbar mechanical-shock plan needs pulse shape, peak, duration and mounting state, not just a g value. Define structural checks and in-event electrical monitoring separately. Passing a specified shock plan does not cover every transport, vibration or short-circuit load.
Define the specimen and its supports
IEC 60068-2-27:2008 covers specified non-repetitive or repetitive shocks, primarily for unpackaged specimens, with guidance for packaged applications using mounting provisions. We recommend identifying a bare conductor, insulated part or installed connection assembly and drawing its actual supports and end connections.
Record span, orientation, attached mass and tightening state, stating whether cables and adjacent parts belong to the specimen. Define packaging cushioning independently. Neither bare-part fixture results nor packaged-product results automatically qualify the other installation.
Keep pulse input and local response distinct
The IEC method uses prescribed pulse shapes selected for the target environment. HBK describes classical pulse generation, response measurement and response spectra. We recommend retaining shape, peak, duration, direction and count, with control-point location and applicable tolerances.
Verify fixture/table input and review responses at critical busbar locations. Label control and response sensors separately and preserve acceleration time histories and exceptions. Equal peaks with different durations are not automatically equivalent; review changes to fixtures or attached mass before comparing outcomes.
Do not omit electrical events during the shock
Specify pre/post four-wire resistance, visual/dimensional checks and whether continuity is monitored during shock. For transient interruptions, agree the circuit, sampling capability, threshold and synchronization. A conductive connection after testing does not exclude brief in-event interruptions.
Document sensor and monitoring-wire installation so it does not unintentionally support the specimen. Review isolation, protection and safety before energized testing. Judge cracks, hole movement, insulation damage and resistance drift against separate agreed criteria instead of an unexplained overall pass.
- Fix specimen and mounting boundaries
- Retain input and response records
- Agree structural and electrical criteria
Frequently asked questions
Are equal g values comparable? Also match shape, duration, direction and mounting.
Does post-test continuity exclude interruptions? Applicable in-event monitoring is needed for that conclusion.
RFQ and shock-validation inputs
Provide busbar/support drawings, attached mass, insulation state and environmental objectives. Agree pulse and monitoring requirements, distinguishing unpackaged, assembled and packaged specimens. Retain exception/retest ownership without inventing a universal shock rating.