Control sealed equilibration, opening and online exposure using the selected paste's documentation. Refrigerated shelf life is not open-container or stencil working life. Retain batch and handling history, then assess printing and soldered results on the actual land pattern.
Separate transit from long-term storage
We reviewed Indium's handling guide, which distinguishes transit and storage and directs users to model-specific shelf-life requirements. Check labels and the applicable document instead of extending one product's transit guidance to all paste storage.
We recommend retaining receipt and temperature exceptions with disposition evidence. Ask the supplier to assess deviations. A cool-feeling container does not release an excursion or authorize extending its date.
Equilibrate sealed containers before opening
Indium advises equilibration before opening cold containers to avoid condensation. Record removal and opening times, considering size and environment. Typical times are not a universal guarantee across models.
Follow packaging-specific homogenization instructions. Jars, cartridges and syringes do not automatically share a mixing procedure. Do not attempt recovery with unapproved heating or solvent additions.
Manage interruptions and recovered paste separately
We recommend identifying recovered stencil paste separately instead of returning it to fresh material. Keep environmental, exposure and interruption records. Agree restart checks using model guidance and validation; working time remains distinct from cold-storage dates.
IPC 7527 addresses print visual evaluation rather than paste-material assessment. Check local deposits on large pads at first article and restart, then confirm placement and soldered outcomes. Acceptable total deposit does not establish unchanged material condition.
Frequently asked questions
Does remaining shelf life permit unlimited stencil use? Control online conditions and working time separately.
Should recovered paste be mixed into a fresh jar? Segregate it and follow supplier disposition guidance.
Process review and RFQ inputs
Provide hardware drawings, lands, stencil and paste model/packaging. Agree storage, opening and interruption records with first-article, restart and soldered checks. Confirm hardware and paste selection separately without promising unvalidated windows.
Apply this guide to a project
Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.
