CUNECTRAPOWER INTERCONNECTS
Back to home

Engineering Solutions

Conditions first. Materials second.

Turn cost, thermal, joint-reliability and manufacturability questions into project inputs that can be validated, quoted and delivered.

01

Cost & Lightweighting

Assess where copper-aluminum or partial substitution is viable, including copper savings, joint limits and lifecycle cost.

Copper reductionWeight optimizationCost boundaries
02

Thermal & Joint Reliability

Address temperature rise and long-term risk through current capacity, contact resistance, fastening, plating and duty cycle.

Temperature riseInterface reliabilityFailure analysis
03

Manufacturability & Sourcing

Translate design intent into material, temper, tolerance, process, inspection and delivery requirements.

Drawing reviewProcess assessmentSupplier alignment

PROCESS

From drawing to volume in four steps.

  1. 01Describe project

    Product, quantity, current and thermal requirements

  2. 02Add project files

    Share 2D, 3D, PDF or photos when available

  3. 03Engineer review

    Material, structure, process and manufacturability

  4. 04Quote & manufacture

    Specification, prototype, inspection and delivery alignment

ENGINEERING METHOD

Validate the current path and every condition for production.

CUNECTRA reviews current, temperature rise, installation, materials, interfaces and manufacturing constraints, placing board-level components, terminals, custom conductors and Cu-Al composites in their real operating context.

PROJECT FAQ

Direct answers to common project questions.

Which copper interconnect products are covered?+

The core scope includes copper-aluminum composite conductors, rigid and flexible busbars, power terminals, and drawing-based custom copper parts.

Can a project start without complete CAD?+

Yes. A 2D drawing, PDF, product photo, or a brief covering current, temperature rise, space and quantity is enough for an initial review.

How is a Cu-Al composite option evaluated?+

Current capacity, temperature rise, interface design, corrosion environment, processing, assembly, long-term reliability and total cost must be reviewed together.

Are both prototypes and volume projects supported?+

Requirements can be defined separately for proof of concept, prototype, pilot validation and volume delivery, including material, process, inspection and quotation terms.

Can international projects be discussed?+

The site provides Chinese and English content and supports bilingual discussion of drawings, standards, delivery regions and project requirements.

PROJECT INQUIRY · RFQ

Describe the project. Start with feasibility.

Prepare the following information where possible. An incomplete brief is still enough to start a discussion.