An applicable surface-insulation-resistance plan can assess process-residue effects around SMT power hardware under biased humidity. Confirm that specimens represent the manufacturing process before agreeing conditions. Ambient cleanliness or a single insulation-resistance reading does not replace this process evaluation.
Select a process-representative test vehicle
IPC's current index lists method 2.6.3.7, dated 03/07 in the original document, using biased comb conductors to assess residues in moisture. ZESTRON describes SIR for process qualification and verification. Define whether paste, cleaning or hardware assembly is being assessed, retaining the actual materials and heat history.
Record standard vehicles separately from actual product structures. For large-hardware adjacent regions and low-clearance residues, agree suitable vehicles and supplementary samples. Document changed artwork or product-board substitutions rather than claiming they remain standard specimens.
Retain bias, environment and controls
Specify conductor spacing, bias and polarity, retaining temperature/humidity history and channel mapping. IPC includes controls and condensation precautions. Review the measuring system, wiring and chamber before assigning a resistance decrease to specimens; condensation is not interchangeable with the same non-condensing plan.
For process comparison, retain unprocessed controls and processed samples, recording source and actual processing state. Test-wire attachment should avoid extra contamination; document rework. Investigate abnormal controls before attributing every decrease to the terminal or busbar material.
Review the trajectory, not only the last reading
Request channel time series, exceptions and post-test images, retaining observations such as dendrites or discoloration. Select sampling and acceptance through the applicable procurement specification. Final recovery or averages must not hide low-value events. A method name alone is not a release criterion.
A passing SIR plan supports only its stated material/process boundary. Review finished-product creepage, dielectric withstand and lifetime separately; do not extrapolate fixed service years from a short test. Reassess applicability after paste, cleaning or reflow changes, retaining the change rationale.
- Define represented process and vehicle
- Retain bias and controls
- Review time series and observations
Frequently asked questions
Does a visually clean assembly make SIR unnecessary? Follow risk and applicable specifications; appearance does not establish biased-humidity behavior.
Does final resistance recovery exclude risk? Review low-value events and post-test observations too.
RFQ and process-validation inputs
Provide hardware layout, conductor spacing, paste/cleaning plan and actual reflow/rework history. Agree vehicles, biased-environment conditions and reporting criteria. Separate process and end-equipment insulation responsibilities, confirming that samples represent this purchasing and assembly scope.
Apply this guide to a project
Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.