Check screw clearance and engagement first, then validate the actual soldering process. A blind-hole component does not establish enclosure protection.
Screw and depth
Review effective engagement and bottom clearance with the final screw, washer and enclosure tolerance stack.
- Separate total hole depth from usable thread.
- Check PCB and surrounding structures.
Reflow
Trial pickup caps, cavities and vent features using actual pads and paste. Investigate voids or movement using recorded process conditions.
- Inspect feeding and thread usability.
- Confirm features against the drawing.
Enclosure sealing
An IP classification concerns the enclosure; joints, seals, openings and assembly need corresponding validation.
- Define sealing paths and service rechecks.
- Provide screw and enclosure requirements.
Apply this guide to a project
Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.