A battery-pack EOL fixture must connect the high-voltage path while keeping interlock, ground and measurement reference traceable. Its busbar and terminal geometry should follow the test procedure and fault protection.
Define busbar and terminal locations from the test states
Separate pre-contact, interlock confirmation, insulation test, load test, disconnect and fault states in the station map. Each state should define high-voltage terminal, protective earth, measurement point and reachable area instead of laying out the fixture from rated current alone.
Separate locating, conduction and protection
Guides and mechanical datums control fixture position. Busbars and terminals provide defined conduction and contact force. Covers, interlocks and grounding hardware provide protection. Separating those functions makes each failure mode easier to inspect.
- Record drop, rise and ground continuity during the specified test sequence
- Check insulation spacing, withstand, terminal position and protective-cover condition
- Repeat interlock, torque and measurement-repeatability checks after stated mating and service cycles
Make safety-fixture conditions part of acceptance
Provide battery-pack interface, test voltage and current, station takt, interlock, mating cycles, insulation class, grounding, tool access, maintenance plan and record format. Sample acceptance should use the actual test program and defined fault-simulation boundary.
Apply this guide to a project
Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.