DC contact resistance can check continuity of an SMT ground spring but cannot alone establish RF shielding. Review working height, contact surfaces and the actual PCB-to-chassis return path. RF evaluation needs explicit frequency and installation boundaries; assess complete-equipment EMC separately.

01

Define the installed contact state

TE describes spring contacts for grounding/shielding with differing geometries and working heights. We recommend drawings identifying free height, installed position and allowed travel, retaining PCB, chassis and fastener stack-up. A spring's single-part height does not establish reliable contact throughout assembly tolerances.

Identify material, plating or coating at the chassis contact area and connection to PCB ground copper. Record compression, offsets and maintenance cycles separately. Single-part elasticity or resistance data do not qualify the entire installed dimensional range.

02

Review the complete RF return path

Würth Elektronik emphasizes low-impedance PCB-to-chassis paths with seam and opening considerations. Review spring placement, ground-copper connections and enclosure seams together. Low DC resistance does not establish low impedance across the target frequencies; two-point continuity cannot release shielding design.

TE's EMI FAQ explains that shielding effectiveness depends on frequency, design, installation and grounding. We recommend retaining frequency ranges, layout, excitation/reception conditions, reference states and calibration basis. A manufacturer's material-sample shielding result is not the complete enclosure/PCB outcome.

03

Separate continuity, shielding and equipment criteria

Retain points, test current and installed condition in the DC plan. Define RF methods, frequency and acceptance quantities separately. Keep other structures consistent during prototype comparisons and record spring installation changes. One low DC reading neither replaces RF testing nor establishes a fixed shielding dB value.

Assess equipment emissions and immunity through applicable product requirements; shielding springs do not automatically guarantee EMC compliance. Protective-earth use requires a separate safety review, not an assumption that ordinary signal-ground contacts are protective conductors. Reassess mechanical/electrical boundaries after coating, location or working-height changes.

  • Define installed working position
  • Review the complete RF return
  • Separate continuity and equipment validation
04

Frequently asked questions

Does good continuity establish adequate RF shielding? Test the target frequencies and actual installation separately.

Will adding more springs guarantee EMC compliance? Review layout, returns and equipment issues; quantity alone cannot guarantee it.

05

RFQ and grounding-validation inputs

Provide PCB ground regions, chassis contacts, stack-up and working height, identifying frequency objectives and evaluation purpose. Agree materials and contact conditions, separating continuity, RF and protective-earth responsibilities. Retain prototype references and equipment-validation plans.

Apply this guide to a project

Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.

Sources

  1. Würth Elektronik shielding and grounding↗
  2. TE Connectivity EMI shielding FAQ↗
  3. TE Connectivity grounding spring selection↗