Compression set compares recovery after unloading under specified conditions. It does not directly calculate a Cu-Al feedthrough's sealing life or IP rating. Align specimens and conditions before selecting a compound, then qualify the actual gland and assembly.
Read compression and recovery together
ISO 815-1, 2019 edition, covers rubber compression set at ambient or elevated temperatures. Results depend on the specified exposure and recovery conditions after unloading. Compare the method and complete process, not only the percentage.
Request the compound designation, hardness, specimen shape and dimensions, compression conditions and release procedure. A material family such as EPDM or silicone does not establish that two reports are comparable.
Distinguish set from installed squeeze
Installed compression in a gland and permanent deformation after release are different records. Show free seal dimensions, gland geometry and mating tolerances, and identify whether the test used standard specimens or actual parts. Do not turn a reported set percentage into a gland design value.
Parker's report guidance emphasizes comparable specimens and the absence of a simple mathematical relationship to service life. Confirm the actual sealing structure after material screening instead of deriving maintenance-free years from one result.
Validate the actual feedthrough
Propose checking the aperture, seal seams and clamped fit, including possible assembly damage to insulation and rubber. Review allowed dimensional conditions and required temperature changes before selecting assembly-level sealing checks.
A material report establishes neither enclosure IP qualification nor electrical insulation acceptance. Keep compound, feedthrough sealing and insulation records separate. Reassess coverage after changing busbar thickness or seal geometry.
Frequently asked questions
Does a smaller number guarantee better enclosure waterproofing? Geometry and assembly still require qualification.
Can ASTM and ISO results be ranked directly? Ask the testing party to compare specimens and conditions first.
ESS PCS feedthrough RFQ inputs
Supply conductor, insulation, aperture and gland drawings, temperature conditions and permitted fluids. List material reports, assembly samples and sealing validation separately. Agree project criteria without adding unsupported life or IP promises.
Apply this guide to a project
Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.
