BMS sensing and main-power connections perform different tasks. Define their signal, current, mechanical and insulation requirements separately.

01

Separate circuit functions

Review harness support and serviceability separately from main-conductor voltage drop and temperature.

  • Mark circuit purpose and connection direction.
  • Identify the structure carrying harness loads.
02

Review Cu-Al interfaces

Check contact surfaces, exposed edges, sealing and installation space for the actual environment.

  • Specify material orientation and finish boundaries.
  • Define equipment-level insulation checks.
03

Validate assembled samples

Compare resistance, thermal and mechanical condition using traceable specimens; retest after relevant environmental exposure.

  • Record fastening and measurement points.
  • Provide interface drawings, quantities and the acceptance plan.

Apply this guide to a project

Use product pages to identify the hardware family and the calculator for early estimates only. Acceptance depends on drawings, operating conditions and project tests.